Commercial surfacing / Sectors

Commercial surfacing by sector.

The same surface can be part of very different packages. The right starting point depends on who operates the site, what has to stay open and who owns the design and preparation.

Section A–A · illustrative

05 · Surface courseAsphalt to the agreed specification
04 · Binder courseRegulates levels and carries load
03 · Sub-baseDesigned for ground and vehicle loading
02 · Drainage & kerbsFalls, gullies, channels, restraint
01 · FormationExcavated, assessed, proof-checked

Layers, materials and depths are specified per site from loading, ground and drainage information.

Choose the package by the way the site is used

Main contractors may need a defined asphalt subcontract with explicit handover checks. Schools and public estates need a scope that distinguishes general hard surfaces from specialist play systems. Facilities managers may be comparing a single repair with a phased asset programme, while housebuilders often need areas released in stages around plot handovers.

What to send before tender

Send the site plan, drawing revisions, required surfacing specification, measured work limits and the deadline. Add restrictions on deliveries, segregation or access, and name the parties responsible for formation, drainage, kerbs and ironwork.

How the proposal is defined

We review the boundaries and site conditions before pricing. The scope should separate included works, allowances and exclusions, and identify what needs to be confirmed before work can be programmed.

Package definition

Five stages. One clear package.

  1. 01

    Scope & documents review

    Read the drawings, specification and quantities; identify work limits, missing information and the tender return date.

  2. 02

    Site use and condition survey

    Review existing pavement, levels, drainage and traffic. Identify the intended loading and whether further investigation is needed.

  3. 03

    Access, phasing and programme

    Agree delivery routes, pedestrian segregation, work windows, closures and the sequence for returning areas to use.

  4. 04

    Interfaces agreed in writing

    Record who is responsible for formation, kerbs, drainage, ironwork and tie-ins. Agree readiness and acceptance checks before surfacing.

  5. 05

    Surfacing, handover and records

    Work to the agreed specification. Confirm reopening criteria and the checks, material information and completion records required for handover.

Before you decide

Frequently asked questions

What if the property fits more than one sector?

Choose the route that best describes the purchasing brief. For a retail site with several operators, for example, start with facilities management and include the main contractor's specification if applicable.

Can you review a preliminary package before drawings are final?

Yes. Mark the information as preliminary, state what is unknown and identify when the specification or quantities will be available.

Does selecting a sector confirm you can take on the work?

No. Scope, location, project-specific requirements and programme are checked before any commitment.

Commercial · Sandbach & Cheshire

Send the drawings. We'll define the package.

Upload drawings, the specification and bill of quantities as PDFs in the tender form (up to three files, 10 MB total). For other formats, include your secure document portal link.