Commercial surfacing / Sandbach

Car park and yard surfacing in Sandbach.

Sandbach is TARSPRA’s base. For business parks and premises near the M6 junction 17 corridor, begin with the exit from the public road and the space available inside the property. A small forecourt can serve visitors, staff and deliveries at once; the whole operation cannot be read from the number of bays.

Section A–A · illustrative

05 · Surface courseAsphalt to the agreed specification
04 · Binder courseRegulates levels and carries load
03 · Sub-baseDesigned for ground and vehicle loading
02 · Drainage & kerbsFalls, gullies, channels, restraint
01 · FormationExcavated, assessed, proof-checked

Layers, materials and depths are specified per site from loading, ground and drainage information.

Make the front of the premises work during renewal

Show the building entrances, turning apron, escape routes and where visitors park when the nearest bays are unavailable. A phased resurfacing boundary needs a sensible pedestrian route and enough width at gates for the arrangements agreed by the operator.

Check the water route at thresholds

Ponding by a roller door or at the junction between a yard and an access road may not be fixed by a new wearing course. Establish finished levels, the condition of channels and the existing outfall before agreeing whether the build-up is suitable to retain. Mark which covers and kerbs are to stay or be adjusted.

Work out which renewal belongs in which budget

A CW11 brief can separate urgent local defects from future renewal. Record how often repairs fail, where it happens, and which parts of the business could accommodate a closure. That helps compare the disruption and scope of different proposals.

Package definition

Five stages. One clear package.

  1. 01

    Scope & documents review

    Read the drawings, specification and quantities; identify work limits, missing information and the tender return date.

  2. 02

    Site use and condition survey

    Review existing pavement, levels, drainage and traffic. Identify the intended loading and whether further investigation is needed.

  3. 03

    Access, phasing and programme

    Agree delivery routes, pedestrian segregation, work windows, closures and the sequence for returning areas to use.

  4. 04

    Interfaces agreed in writing

    Record who is responsible for formation, kerbs, drainage, ironwork and tie-ins. Agree readiness and acceptance checks before surfacing.

  5. 05

    Surfacing, handover and records

    Work to the agreed specification. Confirm reopening criteria and the checks, material information and completion records required for handover.

Before you decide

Frequently asked questions

Can the work include both a visitor forecourt and service apron?

Identify the two work limits and the traffic each carries. They can be reviewed together without assuming the same pavement construction or work sequence.

What if water is running towards a Sandbach unit?

Provide pictures after rain and any drain records. Check the crossfall, thresholds and outlet before deciding whether resurfacing, regrading or a supporting drainage detail is appropriate.

Can we send an early budget brief before a tender is issued?

Yes. Include approximate dimensions and the known constraints, and distinguish preliminary scope from the specification and quantities still to be confirmed.

Commercial · Sandbach & Cheshire

Send the drawings. We'll define the package.

Upload drawings, the specification and bill of quantities as PDFs in the tender form (up to three files, 10 MB total). For other formats, include your secure document portal link.