Portfolio condition audits
Build a site-by-site picture of pavement condition, drainage and access. Identify hazardous defects and agree priorities before committing maintenance spend.
Condition record · priorities · work limits
TARSPRA Commercial · Facilities & Estate Asset Management
Planned resurfacing, pothole remediation and drainage repairs for facilities managers, retail parks, industrial estates and multi-site landlords. Based in Sandbach, serving Cheshire; Greater Manchester and North Staffordshire briefs are subject to coverage confirmation.
Section A–A · illustrative
Layers, materials and depths are specified per site from loading, ground and drainage information.
Speak directly to Dan
Scope-specific competency checks
Insurance evidence on request
Access and working windows agreed
Managing external maintenance should not mean repeating the same brief at every property. Start with a shared schedule of sites, defects and operating constraints. TARSPRA defines the work, interfaces and responsibilities before proposing a programme.
Tenant trading hours, HGV deliveries, accessible routes and emergency access belong in the plan from day one. Closure areas, sequencing and out-of-hours options are assessed before works are agreed.
Talk to Dan about priorities, procurement documents and completion records. Delivery arrangements and any specialist trade responsibilities are stated in the proposal, rather than assumed.
01270 36 1111Move from isolated patchwork to an agreed view of condition, risk and renewal. The specification follows each site, not a universal construction detail.
Build a site-by-site picture of pavement condition, drainage and access. Identify hazardous defects and agree priorities before committing maintenance spend.
Condition record · priorities · work limits
Assess local repairs, resurfacing or full-depth reconstruction against the existing pavement and vehicle loading. Sub-base and asphalt specification follow the ground, turning movements and intended use.
Defined build-up · quantities · specification
Define gully, channel, kerb and service-cover repairs alongside finished levels. Resolve water routes and interfaces before laying the new surface.
Levels · drainage interfaces · responsibilities
Include bay markings, pedestrian routes, accessible parking and EV-bay layouts in the brief. Specialist works and accessibility requirements are confirmed within the agreed package.
Agreed layout · specialist scope · reopening checks
Package definition
What main contractors, surveyors and facilities teams need to see before surfacing is priced — defined stage by stage.
What we define
Record existing pavement condition, levels, drainage and access; confirm whether intrusive investigation or survey is needed.
What you supply
Site location, drawings, photographs and any pavement, drainage or utilities records.
Output
Survey notes and an agreed basis for design.
Stage 1 of 5 · each stage is agreed in writing before the next.
Describe what you have observed at each site. Get a preliminary priority order, reasons and next actions for competent review.
Not a site survey, safety clearance or repair specification. For an immediate hazard, follow your site safety procedures and arrange competent assessment now; do not wait for AI.
List every site address, the defects or planned work, operating hours and your procurement requirements. Include a request for PQQ or RAMS information where needed.
Urgent safety concern? Call Dan. An online brief is not an emergency response service or a confirmed mobilisation.
01270 36 1111Submissions and attachments are stored privately. Receipt is confirmed only after saving; an assessment or works programme is agreed separately.