Tarspra

TARSPRA Commercial · Facilities & Estate Asset Management

One Surfacing Partner Across Your Entire Property Portfolio.

Planned resurfacing, pothole remediation and drainage repairs for facilities managers, retail parks, industrial estates and multi-site landlords. Based in Sandbach, serving Cheshire; Greater Manchester and North Staffordshire briefs are subject to coverage confirmation.

Section A–A · illustrative

05 · Surface courseAsphalt to the agreed specification
04 · Binder courseRegulates levels and carries load
03 · Sub-baseDesigned for ground and vehicle loading
02 · Drainage & kerbsFalls, gullies, channels, restraint
01 · FormationExcavated, assessed, proof-checked

Layers, materials and depths are specified per site from loading, ground and drainage information.

Single point of contact

Speak directly to Dan

CPCS qualified

Scope-specific competency checks

£5M Public / £10M Employers’ Liability

Insurance evidence on request

Phasing around your site

Access and working windows agreed

One brief. Clear accountability.

A coordinated programme. Not a chain of disconnected repairs.

Managing external maintenance should not mean repeating the same brief at every property. Start with a shared schedule of sites, defects and operating constraints. TARSPRA defines the work, interfaces and responsibilities before proposing a programme.

Plan around the people using your estate.

Tenant trading hours, HGV deliveries, accessible routes and emergency access belong in the plan from day one. Closure areas, sequencing and out-of-hours options are assessed before works are agreed.

One contact from scope to handover.

Talk to Dan about priorities, procurement documents and completion records. Delivery arrangements and any specialist trade responsibilities are stated in the proposal, rather than assumed.

01270 36 1111
Lifecycle pavement management

Maintenance built around your asset priorities.

Move from isolated patchwork to an agreed view of condition, risk and renewal. The specification follows each site, not a universal construction detail.

01

Portfolio condition audits

Build a site-by-site picture of pavement condition, drainage and access. Identify hazardous defects and agree priorities before committing maintenance spend.

Condition record · priorities · work limits

02

Structural reconstruction & SMA resurfacing

Assess local repairs, resurfacing or full-depth reconstruction against the existing pavement and vehicle loading. Sub-base and asphalt specification follow the ground, turning movements and intended use.

Defined build-up · quantities · specification

03

Drainage, kerbing & ironwork

Define gully, channel, kerb and service-cover repairs alongside finished levels. Resolve water routes and interfaces before laying the new surface.

Levels · drainage interfaces · responsibilities

04

Line marking & parking layouts

Include bay markings, pedestrian routes, accessible parking and EV-bay layouts in the brief. Specialist works and accessibility requirements are confirmed within the agreed package.

Agreed layout · specialist scope · reopening checks

Package definition

Five stages. One clear package.

What main contractors, surveyors and facilities teams need to see before surfacing is priced — defined stage by stage.

What we define

Record existing pavement condition, levels, drainage and access; confirm whether intrusive investigation or survey is needed.

What you supply

Site location, drawings, photographs and any pavement, drainage or utilities records.

Output

Survey notes and an agreed basis for design.

Stage 1 of 5 · each stage is agreed in writing before the next.

Portfolio decision support · AI

Which defects need attention first?

Describe what you have observed at each site. Get a preliminary priority order, reasons and next actions for competent review.

Not a site survey, safety clearance or repair specification. For an immediate hazard, follow your site safety procedures and arrange competent assessment now; do not wait for AI.

Facilities & portfolio intake

Send the sites. Define the priorities.

List every site address, the defects or planned work, operating hours and your procurement requirements. Include a request for PQQ or RAMS information where needed.

Urgent safety concern? Call Dan. An online brief is not an emergency response service or a confirmed mobilisation.

01270 36 1111

Submissions and attachments are stored privately. Receipt is confirmed only after saving; an assessment or works programme is agreed separately.

Before you commission

Your portfolio questions.