Tarspra

TARSPRA · Commercial · Cheshire

Industrial surfacing starts with the loading.

For service yards, private estate roads and operational hardstandings in Cheshire. Define vehicle movements, retained pavement and access constraints before selecting an asphalt specification.

Section A–A · illustrative

05 · Surface courseAsphalt to the agreed specification
04 · Binder courseRegulates levels and carries load
03 · Sub-baseDesigned for ground and vehicle loading
02 · Drainage & kerbsFalls, gullies, channels, restraint
01 · FormationExcavated, assessed, proof-checked

Layers, materials and depths are specified per site from loading, ground and drainage information.

C/01

Loading

Pavement design assessed against vehicle types, turning and axle loads.

C/02

Drainage

Falls, gullies, channels and outfalls resolved before levels are fixed.

C/03

Programme

Phasing, closures and reopening agreed around site operation.

C/04

Interfaces

Formation, kerbs, ironwork and trade responsibilities defined in writing.

£5m public / £10m employers’ liability
CPCS qualified
Sandbach & Cheshire

Package definition

Five stages. One clear package.

What main contractors, surveyors and facilities teams need to see before surfacing is priced — defined stage by stage.

What we define

Record existing pavement condition, levels, drainage and access; confirm whether intrusive investigation or survey is needed.

What you supply

Site location, drawings, photographs and any pavement, drainage or utilities records.

Output

Survey notes and an agreed basis for design.

Stage 1 of 5 · each stage is agreed in writing before the next.

Structure first

Specify the whole construction.

01

Traffic and loading

Identify delivery vehicles, turning areas, parking, braking and concentrated loading. Vehicle routes and known pavement failures inform the design brief; SMA is not prescribed automatically for every yard.

02

Pavement and drainage

Record cracking, settlement, ponding, covers and kerb interfaces. The wearing course cannot compensate for unsuitable support, so responsibilities for investigations, formation and pavement design need to be agreed.

03

Occupied-site access

Share delivery windows, pedestrian segregation and the areas that must remain accessible. Phasing or out-of-hours work can be requested, but feasibility and programme are confirmed only after review.

A useful first conversation.

  • Site plan, measured work limits and vehicle loading information.
  • Known defects, drainage observations and existing pavement records.
  • Tender return date, delivery restrictions and handover requirements.

Before you decide.

Can you quote from a BoQ?

Send the quantities, specification, drawings and assumptions. We review missing information and interfaces before confirming scope and a proposal.

Can the yard remain operational?

Describe the access that must remain available. Any phasing, closures and temporary arrangements need to be assessed and agreed; zero disruption is not guaranteed.

How do I send CAD or spreadsheet files?

Use a secure document-portal link. The private enquiry upload accepts up to three PDF, PNG or JPEG files totalling 10 MB.

One principle. Two service paths.

Commercial · Sandbach & Cheshire

Send the drawings. We'll define the package.