TARSPRA · Commercial · Cheshire
School hard surfaces. A clearly defined scope.
For estates teams assessing worn asphalt access routes, parking and general hardstanding in Cheshire. Share your intended use and safety requirements so suitability and delivery capability can be reviewed.
Section A–A · illustrative
Layers, materials and depths are specified per site from loading, ground and drainage information.
C/01
Loading
Pavement design assessed against vehicle types, turning and axle loads.
C/02
Drainage
Falls, gullies, channels and outfalls resolved before levels are fixed.
C/03
Programme
Phasing, closures and reopening agreed around site operation.
C/04
Interfaces
Formation, kerbs, ironwork and trade responsibilities defined in writing.
Package definition
Five stages. One clear package.
What main contractors, surveyors and facilities teams need to see before surfacing is priced — defined stage by stage.
What we define
Record existing pavement condition, levels, drainage and access; confirm whether intrusive investigation or survey is needed.
What you supply
Site location, drawings, photographs and any pavement, drainage or utilities records.
Output
Survey notes and an agreed basis for design.
Stage 1 of 5 · each stage is agreed in writing before the next.
Specify the whole construction.
Define the use
Separate access roads and parking from play areas or sports surfaces. Specialist impact-attenuating or certified sports systems are not implied by a general asphalt surfacing enquiry.
Review existing defects
Map trip hazards, cracks, ponding and interfaces with buildings, gates and drains. Agree the survey and design responsibilities before selecting local repairs or wider renewal.
School-site constraints
Provide pupil access routes, safeguarding requirements, restricted delivery times and proposed work windows. Holidays or out-of-hours delivery are requests for review, not a published commitment.
A useful first conversation.
- Site plan identifying parking, access and the intended use of each area.
- Photographs of defects and drainage problems, with work limits.
- Safeguarding, segregation and access requirements plus procurement deadlines.
Before you decide.
Do you publish completed school projects here?
No verified school project records are currently presented on this page. Enquire for a capability review relevant to your specific package.
Is this a playground safety-surfacing offer?
No. Impact-attenuating play surfaces and sports certification require specialist specifications and capability verification. State those requirements explicitly.
Can work be programmed for a school holiday?
Supply the proposed dates. Availability, site constraints and the agreed scope must be reviewed before a programme is confirmed.
One principle. Two service paths.
Commercial · Sandbach & Cheshire

