Structure First. Surface Second.

A surface is the visible part. Levels, drainage, ground conditions and the supporting construction need equal attention.

£5m public / £10m employers’ liability
CPCS qualified
Sandbach & Cheshire
The TARSPRA process

The finish is only the beginning.

What sits underneath determines what the finished surface can do. Five stages, one considered specification.

  1. 01

    Survey & levels

    Illustration: survey & levels in driveway construction
    Construction illustration — not a completed TARSPRA project or a site specification.

    Establish the intended use, existing ground, finished levels and access before choosing a surface.

    Site measurements · access · thresholds · intended loading

    If this is skipped

    An attractive finish can leave awkward thresholds, steep falls or water directed towards the property.

  2. 02

    Excavation

    Illustration: excavation in driveway construction
    Construction illustration — not a completed TARSPRA project or a site specification.

    Define the excavation and disposal scope around existing conditions, services and the proposed construction.

    Existing services · ground condition · formation · disposal

    If this is skipped

    Unsuitable material left beneath a driveway can move or settle under loading.

  3. 03

    Drainage

    Illustration: drainage in driveway construction
    Construction illustration — not a completed TARSPRA project or a site specification.

    Plan where water will go. Falls, channels and any infiltration or discharge solution must suit the site.

    Falls · discharge route · infiltration suitability · planning requirements

    If this is skipped

    Standing water and uncontrolled runoff can affect both the surface and adjoining property.

  4. 04

    Foundation & base

    Illustration: foundation & base in driveway construction
    Construction illustration — not a completed TARSPRA project or a site specification.

    Specify the supporting layers for the ground and intended use, with edge restraint and compaction considered before the finish.

    Pavement design · edge restraint · layer specification · compaction

    If this is skipped

    An inadequate foundation can cause rutting, settlement and cracking, regardless of the surface above.

  5. 05

    Surface & handover

    Illustration: surface & handover in driveway construction
    Construction illustration — not a completed TARSPRA project or a site specification.

    Choose a finish that suits the agreed construction. Complete the specified checks and explain care and maintenance.

    Material suitability · levels · completion checks · care information

    If this is skipped

    Poor finish selection or unresolved details can compromise usability and create avoidable maintenance.

Residential & commercial

Start with a site assessment.