Private development surfacing
Typical packages include non-adopted car parks and access roads, private drives within a development and individual plot driveways. A phased package can distinguish the areas needed for handover from routes still serving heavy construction traffic. Adoptable highway works, including S38 and S278, are subject to capability review and are not claimed as part of this offer.
What we need from your team
Send current drawings, plot release dates, the pavement specification and site rules. Identify loading routes, future tie-ins and any protection or closure requirements. Set out which groundworker is responsible for formation, sub-base, drainage, ironwork and kerbs, and who signs off readiness for surfacing.
Pricing the tender and handover phases
A proposal is based on measured quantities, the required pavement and the division of responsibilities. Show planned release dates and call out temporary access. Additional mobilisation, changes in quantities and returns for later plots should be identifiable in the scope rather than assumed to be included.