Surfacing for developers and housebuilders.

For developers, housebuilders and their groundworks teams tendering private or non-adopted surfaces. Define what must be finished for each handover and what construction traffic still needs to use afterwards.

Section A–A · illustrative

05 · Surface courseAsphalt to the agreed specification
04 · Binder courseRegulates levels and carries load
03 · Sub-baseDesigned for ground and vehicle loading
02 · Drainage & kerbsFalls, gullies, channels, restraint
01 · FormationExcavated, assessed, proof-checked

Layers, materials and depths are specified per site from loading, ground and drainage information.

Private development surfacing

Typical packages include non-adopted car parks and access roads, private drives within a development and individual plot driveways. A phased package can distinguish the areas needed for handover from routes still serving heavy construction traffic. Adoptable highway works, including S38 and S278, are subject to capability review and are not claimed as part of this offer.

What we need from your team

Send current drawings, plot release dates, the pavement specification and site rules. Identify loading routes, future tie-ins and any protection or closure requirements. Set out which groundworker is responsible for formation, sub-base, drainage, ironwork and kerbs, and who signs off readiness for surfacing.

Pricing the tender and handover phases

A proposal is based on measured quantities, the required pavement and the division of responsibilities. Show planned release dates and call out temporary access. Additional mobilisation, changes in quantities and returns for later plots should be identifiable in the scope rather than assumed to be included.

Package definition

Five stages. One clear package.

  1. 01

    Scope & documents review

    Read the drawings, specification and quantities; identify work limits, missing information and the tender return date.

  2. 02

    Site use and condition survey

    Review existing pavement, levels, drainage and traffic. Identify the intended loading and whether further investigation is needed.

  3. 03

    Access, phasing and programme

    Agree delivery routes, pedestrian segregation, work windows, closures and the sequence for returning areas to use.

  4. 04

    Interfaces agreed in writing

    Record who is responsible for formation, kerbs, drainage, ironwork and tie-ins. Agree readiness and acceptance checks before surfacing.

  5. 05

    Surfacing, handover and records

    Work to the agreed specification. Confirm reopening criteria and the checks, material information and completion records required for handover.

Before you decide

Frequently asked questions

Can plot drives be released in batches?

Send a plot schedule and identify the access that must stay open between releases. A phased proposal can identify work limits and the readiness checks needed for each batch.

Do you undertake adoptable S38 or S278 roads?

Those works are outside the stated private surfacing offer and require a separate capability review. Identify the relevant boundaries on your drawings; do not assume adoption requirements are included.

What if different contractors deliver the base and the finish?

Agree who prepares and accepts the base, sets levels and adjusts covers. Issue the design and acceptance criteria before pricing the surface and record the handover between trades.